Technology

Parallel operation of transformers: the five conditions and what happens if you ignore them

Running two distribution transformers in parallel doubles capacity and adds redundancy – if ratio, vector group, impedance and tap positions match. The rules, the tolerances and the circulating current you get when they do not.

September 18, 2026
Parallel operation – Keynetgrid blog

Two 1 000 kVA transformers in parallel are often a better solution than one 2 000 kVA unit: if one fails, half the plant keeps running; maintenance can be done without a full outage; and the second unit can be added later when the load grows. The price is a set of rules that must be respected.

The five conditions

ConditionRequirementEffect of a mismatch
Same voltage ratioIdentical HV and LV rated voltages, same tap positionCirculating current even at no load
Same vector group (clock number)Both Dyn11 or both Dyn5Short circuit between the LV sides
Similar short-circuit impedanceuk within ±10 % of each otherUnequal load sharing; the low-uk unit overloads first
Power ratioNot larger than 3 : 1Small unit reaches its limit while the large one is half loaded
Same phase sequenceL1-L2-L3 connected identically on both sidesShort circuit

Load sharing in numbers

Transformers in parallel share the load in proportion to their rating and in inverse proportion to their impedance. Two 1 000 kVA units with uk 6 % and 5.4 % (a 10 % deviation) carry 47 % and 53 % of the total load: at 2 000 kVA total the second unit runs at 1 060 kVA – a 6 % overload. That is why IEC 60076 recommends the ±10 % tolerance and why the routine test report, which states the measured uk, is worth reading before paralleling.

Circulating current from a ratio mismatch

If the two units are on different taps – one at +2.5 %, the other at 0 % – the 2.5 % voltage difference drives a current through both LV windings even with no load connected. With uk = 6 % on both, the circulating current is 2.5 / (6 + 6) = 21 % of rated current. It adds vectorially to the load current, heats both transformers and is invisible to the load. Always set both tap changers to the same position and lock them.

A common field error: replacing one of two old Dyn5 units with a new Dyn11 unit "because that is the standard now". The two must never be paralleled. Order the replacement with the same vector group – for PNACHO transformers Dyn5 is available on request at no extra cost.

Switchgear and protection

  • Each transformer needs its own LV circuit breaker; the bus coupler between the two sections allows single-unit operation.
  • The LV fault current is the sum of both contributions – recalculate the switchgear rating (for two 1 000 kVA units at 6 %: about 46 kA).
  • Reverse-power or directional protection prevents one transformer from back-feeding a fault in the other.

Specifying a parallel pair

Order both units at the same time and from the same series. Two PNACHO-O 1000 kVA 21/0.42 kV units, for example, are built to the same drawing and tested in the same way; their measured impedances differ by far less than the 10 % tolerance. If you are adding a unit to an existing installation, send us the nameplate photo of the old transformer – we check ratio, group and impedance before we quote.

parallel operationredundancyN+1circulating currentsubstation design
Share this article

Request a quote for your PNACHO transformer

Send us rated power, voltages and the site of installation – our engineers will select the right configuration and send a quote within 24 hours.

See the range